立式精密注塑机,高速射出成型机,电木注塑机

News

Contact

Contact: Mr. Sun


Telephone: 0574-55846306/0574-55846307


Phone: +86 18868918868


Email address: sunquan198@163.com


Fax: 0574-55846308


Add: No.198 Qianjiao Road, Lingnan Industrial Zone, Beilun, Ningbo, China


Website: http://www.nbptjx.com


Alibaba website: shop1450529086289.1688.com


According to the ISO verification of the Peng Tai column injection molding manufacturers 6S originally some sense

Your current location: Home >> News >> Industry news

According to the ISO verification of the Peng Tai column injection molding manufacturers 6S originally some sense

Date:2020-08-25 Author:a Click:

6S Pengtai column injection molding factory, which has been advocating the natural environment, has been dividing the responsibility of the production and processing workshop.


1. All the areas under the management of the production and processing workshop and the areas to be treated shall be governed by the management system of the competent department of construction site management methods in each region, and the production supervisor shall control and control them.


2. The storage area of the grinding tools is managed by the left and right mold workers and the mailers.


3. The raw materials storage area of the assembly computer table which is led out from the warehouse shall be managed by the application department.


4, machinery and equipment finished products, production and processing by the internal and external departments management system.


5, machinery and equipment assembly injection molding factory enterprise office 6S by the administrative clerk. The dining table of the respective company office shall be cleaned by the staff of each company office independently.


6. The person in charge of the workshop shall be responsible for all on-site control in and out of the workshop. If it is found that the operation process is not regulated in accordance with the construction site management method, the person in charge of each area shall be punished.


Ground hygiene requirements clean, clean, do not allow car oil, water, water parts, water parts essence and other dirt.


Three, column injection molding manufacturers stipulate AN full safety channel requirements to keep clean and tidy at any time, do not allow transparent tape, paper, cigarette butts and other dirty things.


4. It is not allowed to place dirt (such as steel cutting, screws, water pipes, common tools, etc.) on the machine platform, and it must be eliminated in different work, such as assembling mold closing cylinder, shooting cylinder and material pipe group at the end of assembly.


Five, workbench, dustbin and all articles resolutely can not cross the line.


VI. Water cups and other items are not allowed to be placed on the floor of the work and on the CNC lathe. In addition, it is not allowed to stick the sealing tape on the floor of the work, on the CNC lathe and other paving products.


7. If there is any damage to the power-consuming instruments such as fans, power cord plugs, power plugs and light tubes in the heavy grip area, report the damage immediately.


Tags:Specialinjectionmoldingmachine

Browse:

Share